This training has passed. Thanks to all participants! Be sure to check our next sessions here.

Increased Service Level and Inventory Optimization at NO Compromise! 


Download our PDF brochure dedicated to this event:

Download PDF

2 days training on DDMRP Methodology (Baarn) – Session 2


In collaboration with Transitive Management and the Demand Driven Institute, a 3 days training class is organized on the DDMRP methodology in Baarn on Feb, 5th – 6th 2015.

CDD Program and Certification 

Module 1: MRP in the Modern World – the materials challenge in the 21st Century

• Key questions for planning and flexibility
• Dealing with Variability
• Materials or Capacity – Where to Focus First
• Continued Relevancy of MRP formal planning
• The Challenge of MRP in Today’s Environment
• MRP and Pull-Based Methods (e.g. Lean, DBR)
• The Stagnation of MRP
• The MRP Conflict

 

Module 2: Demand Driven Material Requirements Planning Introduction

• What does “Demand Driven” mean?
• Blending Independence and Dependence
• Part Types in DDMRP
• Planning and Execution
• The Five Primary Components of Demand Driven MRP
• DDMRP Comparison to Past Practices

 

Module 3: Strategic Inventory Positioning

• The Positioning Factors
• ASR Lead Time
• ASR Lead Time and Matrix BOMs

 

Module 4: Distribution Network Positioning

• Distribution network factors
• Cumulative variability
• Demand driven versus push and promote
• Network Configurations and Options

 

Module 5: Buffer Profile and Level Determination

• Inventory – Asset or Liability
• Buffer Profiles
• Buffer Zones
• Calculating Buffer Levels
• Continuous Improvement and Buffers
• Buffer Level Summary

 

Module 6: Dynamic Buffers

• Recalculated Adjustments
• Planned Adjustments
• Manual Adjustments

 

Module 7: Demand Driven Planning – Stocked Parts

• Part Planning Designations
• The DDMRP Planning Process
• Supply Order Generation for Stocked Items
• DDDRP Supply Order Generation Considerations
• Supply Generation for Non-Stocked Items
• Decoupled Explosion

 

Module 8: Highly Visible and Collaborative Execution

• Challenging Priority by Due Date
• Buffer Status Alerts
• Synchronization Alerts
• Execution Collaboration

 

Module 9: DDMRP and Master Scheduling

• DDMRP Impacts to a Master Production Schedule
• DDMRP and Capacity Scheduling Implications
• DDMRP and Sales and Operations Planning
• DDMRP impacts to ERP

 

Module 10: DDMRP Performance Reporting and Analytics

• DDMRP Performance Reporting
• Analytics

 

Target Group: Supply Chain Professionals, Planning, Procurement, Logistics and Operations.

Online Testing

Register now !

contact-big

meet-team-big